Skip to main content

Tank – Collapsible, 1200 GL (4542.5L), Free Standing

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
000090
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Separate tanks by NFES number. Inspect for punctures, tears.  Look for damaged couplings, and drain plugs.  Inspect flanges and make sure threads are not damaged.
  2. Ensure ball bearings on fitting are working properly.  Repair or lube if necessary.
  3. Inspect seal around flange.  Replace to 2 ½” female flange if tank return is equipped with fittings other than.
  4. Return to stock if unused.
  5. Refurbish item if tears and holes are repairable with local equipment and expertise.  Contact manufacturer for repairs requiring materials or skills not found at the local cache to determine if it is economically feasible to have manufacturer repair tank.
  6. Dispose of item if unable to refurbish.

Refurbishing Procedures

A. Cleaning

  1. Elevate tank, securing the tank to lifting system with a chain or straps to bear the weight of the tank.
  2. Clean tank, inside and outside, with soapy water and a brush.
  3. Rinse well with clean water from high-pressure washer.
  4. Allow to air dry on both sides.

B. Repair

  1. While tank is suspended, mark any holes or damage needing repair.
  2. Patch any hole or tears.  Small pin hole can be repaired with manufacturer recommended TEAR-AID® Type B or other similar material recommended by the tank manufacturer.  Larger holes should be patched with material recommended by the manufacturer utilizing a vinyl welding process.  For extremely large holes, contact the tank manufacturer for recommended repair or replacement options.
  3. Replace all damaged hose couplings and drain plugs.
  4. Stencil correct NFES # of item on collar of tank if missing or unreadable.

C. Testing for performance

  1. Check all patches to insure they are secure and there are no loose edges.
  2. Suspend tank again to spot holes while looking towards light.

D. Repackaging

  1. Fold or roll tank as tightly as possible, secure with plastic banding or rope to keep from unrolling.
  2. 1 each of NFES  #006030, #006031, #007744 in NFES #008158 carton (48” x 22” x 31”).
  3. 1 each of NFES #000090, #000588, #000589, #000668, #000568 recommended in NFES #000500 carton (22” x 22” x 36”).

 

NWCG Latest Announcements

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee