Skip to main content

Hose – Cotton Synthetic Jacket, 1 1/2” NH X 100’, Rubber Lined

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

NFES #
000967
Category
Water Handling
Updated
Storage and Shelf Life Checks
None

Initial Inspection/Disposal Criteria

  1. Segregate by NFES number.
  2. Visually inspect for burns, cuts, damaged fittings.
  3. Recycle brass fittings from disposed hose.
  4. Inspect gasket for cracks, if any replace.
  5. Return to stock if hose is banded and in unused condition.
  6. Refurbish if item passes initial inspection.
  7. Dispose of hose if it fails initial inspection or fails Testing for Performance.  Good couplings should be salvaged from any hose not repairable.

Refurbishing Procedures

A. Testing for Performance

  1. Replace gasket if necessary.
  2. Connect female end of hose to pump or manifold:
    1. Confirm connection ends are not out of round and there is no damage to threads.
    2. All 1½” hose should be NH threads. All 1” hose should be NPSH threads.
  3. Pressure Test:
    1. Start pump.
    2. Make sure nozzles are open. Let all air escape from hose. Shut nozzles.
    3. Pressurize hose to 300 PSI and hold for 3 minutes.
    4. Walk the length of the hose inspecting for the following which indicate a need for repair or disposal:  burns, cuts, or leaks between hose and couplings, at swivel portion of female coupling, and along the length of the hose.
  4. Female and male couplings:
    1. Inspect for leaks where hose goes into coupling.
    2. Inspect for crooked coupling (easier to see when hose is charged).
  5. Shut down pump and relieve water pressure from system.
  6. Remove hose.
  7. Stretch out good hose to drain.

B. Cleaning

  1. Clean excess dirt from hose.
  2. Run hose through hose washer using clean water or clean water with a mild detergent or clean with high pressure wash.
  3. If detergent is used, rinse with clean water.
  4. Allow hose to drain and dry completely before rolling.

C. Repair

  1. Repaired hose shall result in lengths that are a minimum of 90 percent of original length.
  2. Good couplings shall be salvaged from disposed hose.
  3. Re-coupling procedures.
    1. Remove old expansion ring and coupling from hose.
    2. Remove unserviceable portion of hose, squaring end to be re-coupled.
    3. Utilize expander machine to insert new expander and coupling. Follow specific machine operating instructions.
    4. Refurbished hose shall result in hoses that are 90 to 100 foot in length.
    5. Following re-coupling, hose that has been repaired or recoupled should be retested at a test pressure of at least 50 percent greater than the service test pressure following Testing for Performance above.

D. Repackaging

  1. Roll in a single roll configuration with male coupling in center of roll.
  2. Secure roll (plastic band, string)
  3. Local cache option for storage.
  4. Roll, secure, and place on pallet.
    • ​NFES #000932, #001238 - Cache option.  Recommended quantity per pallet 1” X 100’ length/pallet.
    • NFES #000933, #001239 - Cache option.  Recommended quantity per pallet 1½” X 100’ length/pallet.
    • NFES #000966, #000967 - Cache option quantity per pallet.

 

NWCG Latest Announcements

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900

Quarter Four Materials for the 2025-2026 Wildland Fire Leadership Campaign Now Available

Date:  July 8, 2026
Questions? 
Please contact: Leadership Development Subcommittee

NWCG is excited to announce that Fourth Quarter materials for the 2025/2026 Wildland Fire Leadership Campaign are now available. This annual initiative offers all students of leadership and wildland fire management an opportunity to engage with essential leadership skills and knowledge needed to lead effectively in dynamic environments.

Quarter Four materials focus on Leadership Level 4: Leader of Leaders (Provide Direction). Leadership Level 4 is where you are setting the conditions for others to do things well, even when you are not present. This quarter focuses on equipping experienced leaders with skills to provide direction, build trust across teams, and foster strong decision making. 

References:

2025/2026 NWCG Leadership Campaign - Leadership Levels

Wildland Fire Leadership Development Program

Leadership Development Subcommittee

2026 Week of Remembrance

Date:  June 30, 2026
Questions? 
Please contact: 6 Minutes for Safety Subcommittee

As we approach the 2026 Week of Remembrance (WOR), June 30–July 6, we dedicate this time to reflect on past incidents from 2016 and honor the fallen through learning. Since its inception in 2014, WOR has honored wildland firefighters who made the ultimate sacrifice while encouraging critical discussions that reinforce lessons learned.

Throughout the week, we encourage thoughtful and generative conversations that promote a culture of continuous learning and safety.

References:

2026 Week of Remembrance: Letter to Leadership

Wildland Fire Lessons Learned Center