Skip to main content

PMS 936

PMS 936 Symbology Line

View the symbology page for more information.

Symbology: Point | Line | Polygon | Secondary Symbols


Symbol Sort descending Symbol Name Feature Layer Category Link to NWCG Glossary (if one exists)
Two horizontal black lines with a gray line sandwiched between. Access or Improved Road Event Line Reference
A black line with six vertical lines on top with dots between each. Completed Burnout Event Line Ops Completed
Xs create a horizontal hash mark line. Completed Dozer Line Event Line Ops Completed
Horizontal line of Hs with a line in between each one Completed Hand Line Event Line Ops Completed
Four capitals Ps with lines in between. Completed Plow Line Event Line Ops Completed
Horizontal green line with five green squares dispersed  evenly across it. Escape Route Event Line Safety
Horizontal dashed red line. Fence Event Line Reference
A pink zig-zagged line with gaps. Planned Fuel Break Event Line Ops Planned
Horizontal zigzag line. Completed Fuel Break Event Line Ops Completed
Horizontal yellow line with black outline and two yellow dots just within each end. Management Action Point Event Line Reference
A gray long dash and short dash alternate on a line. Other Event Line Reference
Line of four Hs with a dash in between. Planned Hand Line Event Line Ops Planned
A line with four cross hatched areas and gaps in between each one Planned Dozer Line Event Line Ops Planned
A pink horizontal line with three pink vertical lines and two pink dots Planned Burnout Event Line Ops Planned
Horizontal goldenrod colored line. Repair Line Event Line Repair
A line of three yellow dots with three dashes in between. Highlighted Feature Event Line Reference
Four capital R's with lines in between Completed Road as Line Event Line Ops Completed
A line of eight brown dashes. Road Repair Event Point Repair
A line of three blue dashes. Temporary Flight Restriction Event Line Air Ops
Two lines of purple squares stacked on top of one another and forming a checker board. UAS Launch and Recovery Zone Event Line Air Ops
A red horizontal line with five small red vertical lines on bottom. Fire Edge (Field Collection) Event Line Fire
A line of four pink Rs with dashes in between. Planned Road as Line Event Line Ops Planned
A line of four Ps with dashes in between. Planned Plow Line Event Line Ops Planned
A line of four pink Ms with dashes in between. Planned Mixed Construction Line Event Line Ops Planned
Four letters M with a line after each. Completed Mixed Construction Line Event Line Ops Completed
A line of ten purple boxes. Aviation Route Event Line Air Ops
Horizontal black line Contained Event Line Perimeter Line
Red horizontal line with five red ticks on under side from left to right. Uncontained Perimeter Line Fire
Four inverted purple Vs with a horizontal purple line running through them. Aerial Hazard Event Line Air Ops
Four alternating purple circles and blue lines. Water Drop Event Line Air Ops
Alternating four pink squares and purple lines. Retardant Drop Event Line Air Ops
Six pink squares evenly spaced out in an imaginary horizontal line. Proposed Line Event Line Ops Planned
A line of four alternating gray triangles and purple lines. Foam Drop Event Line Air Ops
Showing 1 - 33 of 33 entries

NWCG Latest Announcements

Updated NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Date: May 10, 2024
Contact: IFUASS Qualification and Curriculum Board (IFUASS) 

The 2024 revision of the NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515 is now available. PMS 515 standardizes the processes and procedures for interagency use of Unmanned Aircraft Systems (UAS), including pilot inspections and approvals. This publication is now available as a PDF for easy use offline.

References:

NWCG Standards for Fire Unmanned Aircraft Systems Operations, PMS 515

Memorandum 24-003: Removal of Type 1 Command and General Staff (C&G) Incident Position Qualification Pathways

Date: May 10, 2024
Contact: Aitor Bidaburu 

The purpose of this memorandum is to provide NWCG direction for removal of the Type 1 Command and General Staff (C&G) incident position qualification pathways to transition to Complex Incident Management (CIM). Responders may continue to utilize available NWCG pathways to attain Type 1 C&G qualifications until December 31, 2024.

References:

Memorandum 24-003

CIM Story Map

2024 Professional Reading Program

Date: April 26, 2024
Contact: Wildland Fire Leadership Development Program (WFLDP) 

The Wildland Fire Leadership Development Program is announcing the 2024 Professional Reading list! The intent of the Professional Reading Program is to promote the reading and discussion of these books throughout the year. Discussion guides are provided and the corresponding Wildland Fire Leadership Levels have been identified.

The five books chosen for this year are: Young Men and Fire by Norman Maclean, The Wisdom of the Bullfrog by William H. McRaven, The Art of Clear Thinking by Hasard Lee, Emotional Agility by Susan David, and Writing to Persuade by Trish Hall.

References:

Professional Reading Program

Wildland Fire Leadership Levels

NWCG Training Catalog now on Wildland Fire Learning Portal

Date: April 25, 2023
Contact: NWCG Training  

The National Wildfire Coordinating Group (NWCG) has migrated the training catalog from the NWCG website to the Wildland Fire Learning Portal (WFLP) as part of our ongoing efforts to streamline processes and improve efficiency. To facilitate this transition, the training catalog remains available on www.nwcg.gov through April 2024.

Starting May 2024, the training catalog will no longer be accessible on www.nwcg.gov. However, you can still access the complete training catalog by logging in as a guest to the WFLP.

References:

Wildland Fire Learning Portal