Incident Summary:

On July 2, 1994, seven miles west of Glenwood Springs, Colorado, lightning ignites a Bureau of Land Management fire in piñon-pine and juniper on a ridge at the base of Storm King Mountain. The fire, paralleled by two deep canyons, is initially believed to have “little chance” to spread. The past two days, lightning has started 40 new fires on this BLM District. The entire general area, in a one-year drought, is experiencing low humidities and record-high temperatures. Over the next two days, the South Canyon Fire increases in size. Visible from Interstate 70 and nearby residential areas, the public becomes concerned. Some initial attack resources are assigned. Between July 3-6, the fire grows to approximately 2,000 acres. On July 6, a dry cold front moves into the fire area. As winds and fire activity increases, the fire makes several 100-foot flame-length rapid runs within the existing burn—in dense, highly flammable Gambel oak. Fourteen firefighters perish as they try to outrun the flames. The remaining 35 firefighters survive either by escaping down a deep drainage or by seeking a safety area and deploying their fire shelters.


July 3 – Summary of Activities:

A triangle with the workds Fuel, Weather, and Topography on each side.Airtankers are a valuable asset in the control of wildland fires, but these aircraft can pose serious threats to the safety of air and ground personnel.

The Grand Junction BLM District is in very high to extreme fire danger. Ninety percent of its firefighting resources are committed to more than 40 new fires started in the previous 2 days. 

A red flag warning is issued for dry lightning. Strong winds hamper the effective use of fire suppression aircraft.

One load—eight—smokejumpers, an air tanker, and lead plane are requested.

An engine crew arrives on scene. Its foreman’s initial size-up informs: fire is inaccessible; two flaming trees visible, low spread potential, steep slopes. Until more resources can be obtained, it is recommended that the fire be observed.

Fire Control Officer requests more South Canyon Fire resources from the Western Slope Fire Coordination Center.
 

6MFS Suggestion Form


Have an idea or feedback?

Share it with the NWCG 6MFS Subcommittee
 


Follow NWCG on X and Facebook
 


 

Last Modified / Reviewed:

NWCG Latest Announcements

2025 Week of Remembrance

Date: June 27, 2025
Questions?  Please contact:
6 Minutes for Safety Subcommittee

As we approach the 2025 Week of Remembrance (WOR), June 30–July 6, we dedicate this time to reflect on the past incidents from 2015 and honor the fallen through learning. Since its inception in 2014, WOR has honored wildland firefighters who made the ultimate sacrifice while encouraging critical discussions that reinforce lessons learned.

Throughout the week, we encourage thoughtful and generative conversations—whether in briefing rooms or at tailgates—that promote a culture of continuous learning and safety.

References:

2025 Week of Remembrance: Letter to Leadership

Wildland Fire Lessons Learned Center

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552