Skip to main content

Public Information Officer, Technician

NWCG Committee Realignment Website Updates: Content will continue to be updated over the coming days as we work through final reviews and adjustments, and all publications and products are currently under revision.

PIOT decorative banner: photos depicting PIOT position.

The Public Information Officer, Technician (PIOT) participates in the collection and dissemination of incident information and may be the first public point of contact. The PIOT may be assigned to information center operations, community engagement, media relations, or other branches. On a Type 1, 2, or 3 incident, the PIOT reports to the lead Public Information Officer (PIO) as part of the Command Staff. On a Type 4 or 5 incident, the PIOT may work for the public affairs office, Agency Administrator (AA), or Incident Commander (IC). The PIOT works in the Command functional area.

USWDS Paragraphs

The Forest Service and Department of Interior are enabled by Administratively Determined Pay Plans (AD Pay Plans) to hire persons for temporary duration for the following reasons:

  1. To cope with a sudden and unexpected emergency caused by a fire, or extreme fire potential, flood, storm, or any other all-hazard emergency that threatens damage to federally protected property, has the potential to cause loss of life, serious injury, public health risk, or damage to natural or cultural resources unless brought under immediate control.
  2. To provide emergency assistance to states under formalized agreements.
  3. To meet mission assignments issued by the Federal Emergency Management Agency (FEMA).

The National Wildfire Coordinating Group (NWCG) Incident Business Committee (IBC) reviews positions annually and establishes pay rate classifications for each position.

For more information on the AD Pay Plans, visit Finance and Business Management Committee AD Positions.

Date: Jan 2026

Updated:

  • S-110, Basic Wildland Fire Orientation (including Optional Units)
Date: Jan 2023

Added: Public Information Officer Type 3 (PIO3) to "These Positions Maintain Currency For PIOT."

Date: Mar 2022

Added: IS-700, NIMS: An Introduction added to Required Training.

Date: Dec 2021

Added: Incident Position Description (IPD) approved.

Date: Oct 2021

Position created.

  • There is no position task book and no requirement for incident experience. Agency certification can be accomplished once training is complete.
  • All current qualified Public Information Officers (PIOF) can be qualified as PIOT.
  • All PIOF trainees will be qualified as a PIOT if they have taken the required PIOT courses.
    • S-110 would not be required for qualified or trainee PIOFs once they have taken S-130.
  • Read the complete 2021 PIO Transition Plan.
USWDS Paragraph Bundles



Last Modified / Reviewed:

NWCG Latest Announcements

LMC Equipment Bulletin 26-001: Aquatic Invasive Species – Seasonal Reminder for Mussels

Date:  July 30, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics and Equipment Management Committee (LMC) issued Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels, reminding the wildland fire community that aquatic mussels continue to be a problem. Mussels rapidly colonize hard and soft surfaces, including aquatic plants and fire equipment, clogging pipes, fouling motors, disrupting water systems, and impacting native species.

To help prevent their spread, fire personnel must follow the decontamination procedures outlined in the NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444. Additionally, report any sightings immediately to your Lead Resource Advisor and include clear, close-up photos (with a pen or your hand for size reference) and location details.”

Read the complete LMC Equipment Bulletin 26-001, to learn more. 

References:

NWCG Alerts

LMC Equipment Bulletin 26-001: Aquatic Invasive Species - Seasonal Reminder for Mussels

NWCG Guide to Preventing Aquatic Invasive Species Transport by Wildland Fire Operations, PMS 444

Intermediate Faller (FAL2) Position Task Book Update

Date:  July 24, 2026
Questions? 
Please contact: Tree Felling Subcommittee

NWCG Operations Management Committee (OMC) has issued an update to the NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91. To ensure clarity for both trainees and evaluators, the updated FAL2 Position Task Book (PTB) explicitly states who is authorized to sign off on your tasks:

“Evaluators must be qualified as a FAL2, or an Advanced Faller (FAL1).”

If you are currently working out of a previously published version of the FAL2 PTB, you do not need to restart. However, OMC highly encourages you to take the following step to prevent any confusion in the field:

  • Print and replace the updated evaluator information page (page 2) in your current physical PTB.

References:

Intermediate Faller (FAL2) Position Page

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

NWCG Position Task Book for Intermediate Faller (FAL2), PMS 311-91

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Date:  July 10, 2026
Questions? 
Please contact: Equipment and Technology Subcommittee

The Logistics/Equipment Management Committee (LMC) has released Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups. This advisory highlights multiple U.S. Forest Service regions reporting front driveline joint failure incidents.

This advisory recommends firefighters and fire managers to: 

  • Follow all Ram-issued inspection, maintenance, and service guidance for front driveline joints. 
  • Consider installing a driveline loop. 
  • Coordinate with fleet managers and service providers to determine the most appropriate driveline loop kit for each pickup.

For further details, please refer to the complete advisory.

References:

Equipment Advisory 26-001: Potential Front Driveline Joint Failure on 2018 and Earlier Ram Pickups

Technical Service Bulletin: 03-002-21

NEW! NWCG Standard Operating Procedures, PMS 900

Date:  July 9, 2026
Questions? 
Please contact: NWCG Staff

NWCG is excited to announce the publication of the NWCG Standard Operating Procedures, PMS 900.

The new publication establishes general, consistent, and uniform standards for conducting business with the National Wildfire Coordinating Group.

References:

NWCG Standard Operating Procedures, PMS 900