Skip to main content

Share Public Web Products


The continued growth and expansion of the NIFC AGOL Org has meant that the NIFC AGOL Org has entered a new phase of public publishing. To keep in line with DOI security policies, tighter controls and oversight of public content shared from the NIFC AGOL Org have been created. 
Any user that needs to have non-emergency content shared with the public must fill out the Public Publishing Request Form. The NIFC Data Manager role is the only role that can share content to the public. This is to ensure that on an active incident, emergency and incident related content can be shared with the public without having to go through the form and approval process. Users in the Data Manager role, not on an active incident, must go through the approval process.

Careful consideration must be given to each product shared with the public. Always ensure that public content has been approved by the appropriate party at the unit or on the Incident Management Team (IMT) and does not contain any non-public information.

NIFC Org Public Content Policy

The Public Content Policy and other rules and requirements for NIFC Org content can be found in the NIFC Org Rules of Behavior.

Publicly shared content must serve a current, legitimate business need to provide information to the general public.

Publicly shared feature services shall not have Sync or Edit enabled, relative date queries or extent filters shall not be used in any filter or view definition, and the cache control will be set to 5 Minutes at a minimum.

Rate Limiting

When a database is receives an excessive number of requests, it will cease to respond and begin returning errors to protect the system from being overwhelmed. This is called rate limiting and is generally associated with error number 429.

Rate limiting most often occurs when a public service is not configured properly and is included in a map that goes viral, resulting in a massive amount of demand.

Rate limiting is applied to and affects the entire NIFC Org, not just the service(s) causing it. 

If you receive a 429 error, please submit a Support Request.

Critical Settings

The most important aspect of public data sharing is ensuring that the content can handle the potential load of thousands upon thousands of views.
In 2020, the official public perimeter service received nearly 3 billion hits (that’s billion, with a B).

This scalability is accomplished through the use of a Content Delivery Network (CDN). A CDN uses many geographically distributed servers to cache and deliver the data as opposed to relying on only the one that houses the source database.

Properly configured services hosted in the NIFC Org will leverage the Esri CDN automatically.

There are three primary settings that will affect a service’s ability to use the CDN (i.e., be cached): Edit, Sync, and Cache Control.

Several query types also affect caching: Relative Date/Time and Extent Filters.

Edit

Editing must be disabled on all publicly shared services.

Enabling editing on a public service will allow anyone in the world to modify the data. There are very few cases where this is desirable and should generally be avoided for that reason alone.

However, the pertinent reason here is that editable services do not use the CDN. When enabled, each call will travel all the way to the database to ensure any edits are performed on the current data state (e.g., you would not want to update a feature that someone else deleted several minutes ago).

Sync

Sync must be disabled on all publicly shared services.

The Sync setting allows users to create a replica of the data such as taking a map offline in Field Maps or creating the Offline Copy of the NIFS in ArcGIS Pro.

Like Edit, having Sync enabled will stop the use of the CDN, forcing each query all the way to the database to ensure currency.

Cache Control

The cache control will be set to 5 Minutes at a minimum for any public service.

The Cache Control setting determines how long the CDN will wait before refreshing the information it has cached.

Only set the cache control higher than 5 minutes if the data is not updated or is not time sensitive. Setting the cache control to 1 hour will potentially result in up to a 1-hour delay in updates being seen by end users as the cache waits to refresh.

Relative Time Queries and Extent Filters

Relative date queries or extent filters shall not be used in any filter or view definition.

Relative time queries and extent filters may produce requests that are not cached on the CDN and therefore have the potential to cause rate limiting.

Relative Time
A relative time query is based off a reference to the current date-time. Another way to think of this is as a rolling time frame, such as:

  • FireDiscoveryDateTime is in the last 3 days
  • EditDate is not in the last 2 weeks

Extent Filter
Extent filters are configuration options in certain web apps and dashboards. Most often they are used to produce a count or list of features within the displayed area. Every time a user pans or zooms the map with the extent filter, it sends a request for the data within the displayed area which can quickly add up to a significant load.

There are some scenarios where relative time queries and extent filters can be configured and not affect the database.
High-use apps (state or regional) that need to leverage either relative date queries or extent filters may be approved for use by the NIFC Admins with review. To obtain approval, please submit a Support Request.

Hosted Feature Layer Views

The best way to create cacheable services for public use when the data still needs to be editable by someone is through Hosted Feature Layer Views.

A Hosted Feature Layer View is a new service with independent settings that points back to the same data as its parent service.

This allows the implementation of an internal, editable layer for data management, and a cacheable read-only layer for sharing publicly.

Official Services for Public Use

For some data, optimized layers for public use have already been created and are available on the NIFC Open Data Site.

When wildland fire (point) locations and/or perimeters need to be displayed in public content, the official Open Data Site layers should always be used.

 

Last Modified / Reviewed:

NWCG Latest Announcements

Leadership Committee IAP Flyer Now Available

Date:  May 8, 2026
Questions? 
Please contact: Leadership Committee

The NWCG Leadership Committee promotes and enables leadership development across the wildland fire service. The committee provides education, training opportunities, and support for leadership innovation and best practices throughout the community.

A new IAP flyer is now available on the committee website, offering an overview of the products, curriculum, and learning opportunities the Leadership Committee develops. This resource is ideal for posting in your office, sharing with new employees, or distributing through your incident management teams to engage new voices in the leadership journey and reinforce a culture of self‑reflection, development, and growth.

References:

Leadership Committee 2026 IAP Flyer

Incident Operations Subcommittee Updates the Next Generation Position Task Book for FFT1

Date:  May 7, 2026
Questions? 
Please contact: Incident Operations Subcommittee

The NWCG Incident Operations Subcommittee (IOSC) has updated the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14. The FFT1 Position Task Book transitioned to the Next Generation (Next Gen PTB) format in June 2025 through the Incident Performance and Training Modernization effort. Since then, IOSC has received feedback from the wildland fire community regarding coding for one of the tasks. Task #13 has been updated to include the option of evaluation in a simulation.

See IOSC Memorandum 26‑01: Transition Plan for Implementation of Updates to the NWCG Position Task Book for Firefighter Type 1 (Squad Boss) (FFT1), PMS 311‑14 for more information.

References:

IOSC Memorandum 26-01: Transition Plan for Implementation of Updates to the NWCG Postion Task Book for Firefighter Type 1

NWCG Firefighter Type 1 Squad Boss Position Page 

NEW! S-212, Intermediate Faller (Online) Course Available Now 

Date:  April 23, 2026
Questions? 
Please contact: Hazard Tree and Tree Felling Subcommittee

NWCG is pleased to announce that the new S‑212, Intermediate Faller (Online), course is now available on the Wildland Fire Learning Portal (WFLP). This second course in the series provides students with the knowledge and skills required to perform the duties of an Intermediate Faller (FAL2), as described in the FAL2 Incident Position Description. This course is intended for individuals seeking to advance from Basic Faller (FAL3) to FAL2.

S‑212, Intermediate Faller is a fully online, self‑paced training program consisting of 13 units. Learners will engage with interactive, scenario‑based content designed to progressively build foundational skills and knowledge essential for the FAL2 role.

Students must be qualified as a Basic Faller (FAL3) prior to enrolling in S‑212, Intermediate Faller course.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for January 2027.

References:

S-212 Intermediate Faller (Online)

RMC Memo 26-01: Transition Plan for Implementing Updates to Intermediate Faller (FAL2) Position Qualifications

Intermediate Faller (FAL2) Position Page

NWCG Standards for Wildland Fire Chainsaw Operations, PMS 212

New Aircraft Flight Schedule Form, PMS 249

Date:  April 17, 2026
Questions? 
Please contact: National Coordination System Committee

A new publication from the National Coordination System Committee (NCSC) is now available. The NWCG Aircraft Flight Schedule Form, PMS 249, will be used for aviation crews and dispatch to share flight information that is needed for resource tracking, and if needed, for emergency procedures.

For further details, please contact your NCSC representative. 

References:

NCSC Memo 26-01: Implementation of NWCG Aircraft Flight Schedule Form, PMS 249

NWCG Aircraft Flight Schedule Form, PMS 249