Skip to main content

Create the Edit Project


The Edit Project is where all data editing should be done to prevent database locks and ensure proper attribution. It is saved to the Projects folder*.

Each GISS should have their own Edit Project with properly configured feature templates.

The naming convention for the Edit Project is edit_2025_{incidentName}_{localIncidentID}_{yourName}.

  1. Save As on the Pro Project Template to create a new project at the root of the \projects folder, and name it edit_2025_{incidentName}_{uniqueFireID}_{yourName}.
    This is the Edit Project, all data editing should be done here. 

    Edit the project

*Do not save the Edit Project in a OneDrive synced folder. If using OneDrive to sync the GeoOps directory from the incident’s SharePoint files, save the Edit Project to a logical place on your local C: drive such as C:\2025_Incidents\2025_Demo.
  1. Add “edit” as the {MapType} to the Map View title.   

    Edit the Map View title
     

  2. Open the DynamicTextUpdate table and fill in the IncidentName and UniqueFireID attributes. If the incident name is more than one word, do not use CamelCase in attribute tables; use a space (e.g. “Cedar Creek”). 

    Add dynamic text


    Note: Values in the DynamicTextUpdate table will populate dynamic text elements in every template layout in every ArcGIS Pro project for the incident. It should be edited from the Edit Project while all other projects are closed so the updated values will populate properly. This provides a single source to update the current acreage and other attributes for all layouts at once. Additional attributes can be added and utilized with their own Dynamic Text tags. Multiple rows can now be utilized with the use of a custom query.

  3. Save the edits to the table.

 

Last Modified / Reviewed:

NWCG Latest Announcements

ETC Equipment Bulletin: 25-003 Flame-Resistant Shirt Survey

Date: June 12, 2025
Questions?  Please contact:
Equipment Technology Committee

The U.S. Forest Service National Technology and Development Program (NTDP) is seeking input on the Forest Service-designed flame-resistant (FR) shirt, currently available through the National Interagency Support Cache system and FedMall.

NTDP is conducting a product review to improve future FR shirt designs. As part of this effort, a short survey is now open for federal employees who have worn any of three recent FR shirt models. Feedback will guide design improvements to better meet the needs of wildland firefighters.

To comply with the Paperwork Reduction Act, responses are limited to federal employees. The survey is open through September 12, 2025. 

References:

NWCG Alerts

ETC Equipment Bulletin: 25-003

NEW! S-130, Firefighter Training (Blended) Now Available

Date: June 10, 2025
If you have questions, please visit our FAQ page. 
If your question is not answered there, you can 
submit your question using our Contact Us form. 
 

The S-130, Firefighter Training (Blended), equips new wildland firefighters with essential skills through a mix of online learning and hands-on training. The course features a required online component and an instructor-led exercise, reinforcing online concepts with practical performance-based training.

The course builds competencies in wildland fire operations, safety, and equipment use, applicable across various operational environments. Both the online component and instructor-led field exercise must be completed to receive a certificate of completion. Students are required to finish the prerequisite S-190, Introduction to Wildland Fire Behavior, before enrolling in S-130, Firefighter Training (Blended).

References:

S-130, Firefighter Training (Blended)

S-190, Introduction to Wildland Fire Behavior

Wildland Fire Learning Portal

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

Date: June 3, 2025
Questions?  Please contact:
Emergency Medical Committee

The Emergency Medical Committee has issued interim guidance for Rapid Extraction Module Support (REMS) teams. Until further notice, Type I and II REMS teams must designate a team leader qualified at Firefighter Type 1 Squad Boss (FFT1) or higher. This temporary change replaces the Single Resource Boss (SRB) requirement, which is currently not feasible due to administrative barriers.

This memorandum does not include any other changes to the NWCG Standards for Rapid Extraction Module Support, PMS 552. This interim change takes effect immediately and will remain in place until further notice.

References:

EMC Memo 25-001: Interim Rapid Extraction Module (REMS) Training and Qualification Requirements

NWCG Standards for Rapid Extraction Module Support, PMS 552

Equipment Bulletin 25-002: Chaps, Chain Saw, M-2020, Nonconformities Affecting Use, Appearance, and Serviceability

Date: June 2, 2025
Questions?  Please contact:
Equipment Technology Committee

The Equipment Technology Committee issued Equipment Bulletin: 25-002 to address a manufacturing nonconformity affecting Forest Service specification, 6170-4K Chain Saw Chaps. The issue applies to chaps manufactured in 2024 and 2025 and distributed through FedMall. These chaps may have incorrectly bound edges that expose inner protective layers.

Independent purchasers should inspect all chain saw chaps received from FedMall beginning in 2024, prior to use. Review the full Equipment Bulletin: 25-002 for inspection criteria and recommended actions.

References:

NWCG Alerts

ETC Equipment Bulletin: 25-002