Skip to main content

Firefighter Math: 9.8 Production Rates

When planning an attack on a fire, the length and width of the line must be estimated, along with the capabilities of the hand crew(s), to determine how many crews will be needed. Generally, a 15-person crew should be able to construct a 3-foot fireline around a 1-acre grass fire in 1 hour. Below are some average ideal rates for hand crew production rates in various vegetation.

hand crew production rates

Example 1 - Patricia spots a fire burning in open prairie. She determines that the fire has a perimeter of 1,800 feet. How many hand crews should she assign to construct a 3-foot line around the fire in 1 hour?

Step 1. Look under the column for grass vegetation of the hand crew production rates chart above. Follow the column down vertically.

Step 2. Look for the row that tells how much line a crew can cut per hour. Follow the row across horizontally. Where the two lines intersect is the number of lines per hour an average crew can cut in those conditions. 
One 15-person can cut 900 ft of line per hour

Step 3. Use this information to calculate the number of hours it will take one crew to construct 1,800 feet of line.

1,800 feet of line calculation
It will take 1 crew 2 hours to cut 1,800 feet of line.
Step 4. Determine how many crews it will take to construct the line in 1 hour.

1 crew 2 hours 1800 feed of line

To cut 1,800 feet of line in 1 hour, Patricia needs to assign two crews of 15 people each.
 

When arriving at a fire scene, always assess the entire situation to determine the best way to suppress the fire.

 

NWCG Latest Announcements

2026 Week of Remembrance

Date:  June 30, 2026
Questions? 
Please contact: 6 Minutes for Safety Subcommittee

As we approach the 2026 Week of Remembrance (WOR), June 30–July 6, we dedicate this time to reflect on past incidents from 2016 and honor the fallen through learning. Since its inception in 2014, WOR has honored wildland firefighters who made the ultimate sacrifice while encouraging critical discussions that reinforce lessons learned.

Throughout the week, we encourage thoughtful and generative conversations that promote a culture of continuous learning and safety.

References:

2026 Week of Remembrance: Letter to Leadership

Wildland Fire Lessons Learned Center

RMC Memorandum 26-02: SAFENET Modernization and SafeNetX Launch

Date:  June 25, 2026
Questions? 
Please contact: Risk Management Committee

The Risk Management Committee (RMC) is pleased to announce the launch of SafeNetX, the modernized safety reporting system now available to the wildland fire community. Effective June 15, 2026, SafeNetX enables reporting of unsafe, unhealthy, near-miss, and high-risk operations across wildland fire, all-hazard incidents, training, and related work environments.

SafeNetX is the result of a multi-agency modernization effort led by RMC, which began evaluating improvements to the legacy SAFENET system in 2021. To learn more, read the full RMC memorandum in the links provided.

References:

SafeNetX

RMC Safety Memorandum 26-02: SAFENET Modernization and SafeNet X Launch

2025 Wildland Fire EMS Awards

Date:  June 12, 2026
Questions? 
Please contact: Emergency Medical Committee

The NWCG Emergency Medical Committee (EMC) announces the recipients of the 2025 Wildland Fire Emergency Medical Service (EMS) Awards. EMC annually recognizes individuals and groups who have demonstrated outstanding actions or accomplishments that are above and beyond the expectation of one’s normal mission or job duties.

Congratulations to all the awardees and nominees. Through leadership and initiative, they have made significant contributions to the safety of the wildland fire community. These awards are well deserved.

References:

2025 Wildland Fire EMS Awards

Emergency Medical Committee

Incident Position Standards and the Next Generation Position Task Book Now Available for RAMP

Date:  June 12, 2026
Questions? 
Please contact: Airtanker Base Operations Unit

NWCG is excited to announce that Incident Position Standards and the Next Generation Position Task Book are now available for Ramp Manager (RAMP).

The Performance Support Package for this position was developed as part of the Incident Performance and Training Modernization effort. These resources support trainees, qualified personnel, and evaluators in their respective roles.

Any changes to qualification pathways will take effect with the next update of the NWCG Standards for Wildland Fire Position Qualifications, PMS 310-1, scheduled for release in January 2027.

References:

NWCG Ramp Manager Position Page

National Interagency Aviation Committee